Work life balance

The Elite is due a major service ahead of a rolling restoration and the Elan’s engine rebuild continues

Raymond Robinson

Work life balance

Raymond Robinson

Cars Europa S2 since 1978, Elan Plus 2 since 1981, Esprit S2 since 1985, Elite since 1988, Elite S1 since 1992 This time The Elan’s engine rebuild continues

Snow in April here in Canada resulted in a slow start to the season, but May was warm enough to start work on a major service for the 1960 Elite. Work that’s due includes fitting a new exhaust, cleaning the Weber carburettor, tidying the engine bay, replacing the front dampers and removing the diff to replace the rear bearings. Although they are not worn, the seals are showing signs of cracking. After 66 years of service, it’s time.

I’ll also replace the bearings for the S1 trailing links. This will not be as straightforward as it sounds because of the locking pin and cross-shaft being frozen in place. I will need to drill out the pin and cross-shafts to the point where there’s a thin wall of metal left to then file one side of that to accurately remove metal without damage to the link.

The rear suspension will receive new dampers, and I will clean, tidy and paint wheel wells and diff area. In will go new carpets, and I’ll fit new covers for the seat and door panels. While the interior is out, I’ll tidy the glassfi bre surface cracks around the rear suspension and repair some delamination on the roof. Hopefully all this will be completed by the end of June to start work on the Elan Plus 2S.

The Elan’s head finally came back from the machine shop. They moved premises, so I had to wait for them to set up in the new place before taking the head to them. The valve seats look great after a multi-angle cut. As with the Europa’s head, I followed my machinist’s recommendations to drill and sleeve the guides with new brass inserts.

Fitting valves comes next, then I will need to do the baseline for the valve clearances to see which cam buckets to order. I could clean up the originals, however with all the other new higher quality parts going on, it’s better to replace them.

I am looking forward to restoring the engine bay as this car has never been apart. With only 26,000 miles on it, it still has all the original factory wiring harness and other fittings. The plan is to complete the mechanical, electrical and interior work so I can drive the Elan, then do the bodywork.

Fortunately, the derelict look is popular for certain classic cars so one can drive around in a car that looks a little scrappy and people treat it as a deliberate look. This way I can enjoy driving the car, while taking my time on the bodywork as it will not be a weekend project.

On the cool new tools front, while helping my friend Ryan change the clutch on his Countach 25th Anniversary I got to try out my new magnetic pad from Osla tools. The low-level magnetics mean you can place fasteners on it and they will not jump around like they do in magnetic trays. It holds your tools, and is perfect for working under the dash.

I took the Europa to the first cars and coffee of the year. It was a fascinating study in modern cars being over-engined and over-sized. A Lamborghini Aventador looks like an SUV when parked next to it.